45K SF renovation of a three story building located at 6801 N. Capital of Tx Highway. The remodel of their existing office space was completed in two phases over the course of eleven months with employees being moved within and between buildings to allow for construction. The first phase was a remodel of the ground and second floors that included the build-out of a new ground floor server room and relocation of the existing equipment from the second floor without affecting business operations.

The second phase was the gut and remodel of the second floor that included a new Network Operations Center. During the Value Engineering process, Sabre was able to keep the project under budget by changing to CRAC units rather than the specified split system.

Even though Sabre and Carson Design Associates worked through two complete redesigns that took place during construction, the project still completed ahead of schedule. Sabre worked hand-in-hand with the architect, engineer, furniture vendor, and the client to keep all last minute redesigns from delaying the project.

The result of the project was a sophisticated new office to match the high end technology center that NCSOFT needed to keep operations running.